banner

Morganza Spillway Opening Delayed, Again

Written by

Last Updated on

NEW ORLEANS – Based on the current forecast, the U.S. Army Corps of Engineers is delaying operation of the Morganza Floodway until June 9, 2019.

The Mississippi River is predicted to reach 60 ft. at the structure on June 12, 2019 instead of the previously forecasted June 9, 2019.

The Army Corps of Engineers only intends to operate the structure when needed as to not put additional water into the Atchafalaya Basin.

Article Categories:
Breaking News · High Water Updates · Local News

Comments are closed.